
Zumbrota RMTAL6J-1 - AL6 Manual Transmission 2018-22 Jeep Wrangler, 20-22 Gladiator, 3.6L, 4WD, 6 Spd
Zumbrota RMTAL6J-1
*some restrictions apply
- Part Number:
- RMTAL6J-1
- SKU:
- GJSP-RMTAL6J-1
- UPC:
- 883584131854
- Availability:
- Special Ordered - Not In Stock
- DISCLAIMER - THIS ITEM IS A SPECIAL ORDERED PART:
- This item is Special Ordered - product is subject to the return and cancellation policy as seen in our terms and conditions. This may result in cancellation restrictions, or higher than normal restocking fees.
Zumbrota - RMTAL6J-1
AL6 Manual Transmission 2018-22 Jeep Wrangler, 20-22 Gladiator, 3.6L, 4WD, 6 Spd
Remanufactured Manual Transmission; 2.86 qt. Capacity; Aluminum Case; w/Integral Bell Housing;
Zumbrota Drivetrain Manual Transmissions are rebuilt to the highest quality standards using a 3 step inspection process. Step 1 is a pre-inspection for case cracks, excessive wear, and OEM specific problems. Step 2 measures component parts to ensure OEM specifications are met. Step 3 ensures each unit is built to our exacting quality standards. Shaft straightness, gear wear & synchronizers are extensively tested to meet OEM specs. Seals are replaced and units are dyno-tested for operation, shiftability, and noise level. Unrivaled standards are set for unit precision and reliability at all critical touchpoints. Then an exclusive hydro-blast rinse & sandblasting procedure on internal and external parts, followed by proprietary shot-enticed deep cleaning, sets the standard for manual transmission remanufacturing.
- A Pre-Inspection Is Done To Ensure The Unit Is Free Of Case Cracks; Excessive Wear
- And To Catch Other OEM Related Problems That Many Cores Have
- 100 Percent Inspection Of Internal Parts; Including Gear Wear Checks
- Including Mainshaft Straightness Test And Synchronizer Testing
- A Second Inspection Is During The Reman Process To Ensure All Component Parts Meet OEM Specification
- A Final Post-Build Inspection Is Done To Ensure Unit Is Built To Our Strict Standards
- Quality Inspections Are Conducted 3 Times During The Remanufacturing Process