CSP SAVINGS!

CSP2026

CURT 58445 - Long-Lead Mini Fuse Bypass Switch

CURT  |  SKU: CURT-58445
Regular price $000


AVAILABILITY: This Item Is No Longer Orderable. Contact Us For More Details.


PLEASE NOTE: Pictures may be representative of style, rather than the actual product. Read the description for more details.

Description

CURT 58445 - Long-Lead Mini Fuse Bypass Switch

CURT 58445 Long-Lead Mini Fuse Bypass Switch for RV Dinghy Towing

This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.

  • Long-Lead Mini Fuse Bypass Switch
  • Helps avoid having to remove and replace fuses when flat towing your vehicle
  • Vehicle-specific application for a custom fit
  • Integrates with CURT RV harness (sold separately)
  • Includes bypass harness, fuse holder and other components
  • Fuse not included
  • 20-amp max
  • One-year warranty
Box Height in Inches - XA: 0
Box Length in Inches - XA: 0
Box Width in Inches - XA: 0
Class ID: 11
Container Cases Qty - XA: 0
Container Pallet Qty - XA: 0
Container Unit Qty - XA: 0
Container Volume Cubic Feet - XA: 0.00000
Container Volume Cubic Meter - XA: 0.00000
Container Weight KG - XA: 0
Container Weight Lbs - XA: 0
Finish: BLACK RUBBER
Finish - XA: BLACK RUBBER
Item Class - XA: CME
Item Height - XA: 0.000
Item Length - XA: 0.000
Item Width - XA: 0.000
Master Case Height Inches - XA: 0.000
Master Case Inner Pack Qty - XA: 0
Master Case ITF14: 0
Master Case ITF14 - XA: 0
Master Case Length Inches - XA: 0.000
Master Case Qty - XA: 0
Master Case Volume Cubic Feet - XA: 0.00000
Master Case Weight Lbs - XA: 0.000
Master Case Width Inches - XA: 0.000
Material - XA: THERMOPLASTIC RUBBER
Mount Type Description - XA: Not Applicable
Pallet Case Per - XA: 0
Pallet Case Per Layer - XA: 0
Pallet Cases Per - XA: 0
Pallet Cases Per Layer - XA: 0
Pallet Layer of Cases - XA: 0
Pallet Qty - XA: 0.000
Pallet Total Height Inches - XA: 0.000
Pallet Total Weight Per - XA: 0.000
Parcel Allowed - XA: Yes
Price Code - XA: E15
Product Weight - XA: 0.000
Rate Class - XA: 400.0
Retail Height - XA: 2.000
Retail Length - XA: 9.000
Retail Width - XA: 4.000
Sales Family Code - XA: ELECT
Sales Family Description - XA: ELECTRICAL COMPONENTS
Sales Group Description - XA: RV HARNESS
Shipping Weight - XA: 1.000
Side Application Type Description - XA: Not Applicable
Tariff 301 - XA: No
Truckload Cases Qty - XA: 0
Truckload Pallets Qty - XA: 0
Truckload Units Qty - XA: 0
Truckload Volume Cubic Feet - XA: 0.00000
Truckload Weight - XA: 0
Warranty: One-Year Limited Warranty

What are people saying about CSP?